88.5 Acres of Development Land

Two prime parcels · Greater Napanee, Ontario
Contact Jason
Strategic Growth Area · County Road 1 West

88.5 acres of development land for sale in Greater Napanee

Contiguous acreage inside the town’s approved growth plan, at the western edge of the urban area and minutes from Highway 401.

$30,000,000
MLS® 29559134
Satellite view of the 88.5-acre parcel outlined between County Road 1 and the CN rail line, bounded by a tree line on the west and the neighbouring field on the east, with the creek crossing it88.5 ACRESCOUNTY ROAD 1CN RAILcreek
88.5 acres · Boundaries approximate · Imagery © Google
88.5
Contiguous acres in the Strategic Growth Secondary Plan Area
2.5 km
About 2.5 km by road to the Highway 401 / Highway 41 interchange
2028
Wastewater plant expansion in service, adding capacity for up to 4,000 homes and businesses
Oct 21
Official Plan approved by Lennox & Addington County, 2026
The property

Approved for growth, with the groundwork done

These 88.5 contiguous acres sit at the western edge of Napanee’s urban area, between County Road 1 and the CN line. Greater Napanee’s new Official Plan, approved by Lennox & Addington County on October 21, 2026, places the parcel in the Strategic Growth Secondary Plan Area, one of the designated areas where the town will grow over the coming decades. Holdings of this size inside the growth areas rarely come to market.

The land is owner-farmed and in active production, with frontage on County Road 1 and a creek running through it. It is already inside the urban boundary, so no boundary expansion or annexation stands between it and secondary planning. The Environmental Assessment completed in 2024 fixed the arterial roads for the growth lands, and its Cherrywood Parkway to County Road 1 alignment crosses the property.

Sewer capacity is being built now. The $88M wastewater plant expansion is expected in service in 2028 and is estimated to add capacity for up to 4,000 homes and businesses. Secondary planning comes next and sets land uses, densities, local streets and servicing, and landowners can take part as it is prepared.

At a glance
Price
$30,000,000
Size
88.5 contiguous acres
Location
Lt 15-16 County Road 1 W, Greater Napanee
Designation
Strategic Growth Secondary Plan Area, Schedule A of the Official Plan
Zoning
Future Development (D) north of the creek and Extractive Industrial (M4) south of it, with Environmental Protection (EP) along the creek, under By-law 02-22. No aggregate licence is held on the property.
Roads
The EA’s Cherrywood Parkway to County Road 1 arterial alignment crosses the property
Land
Owner-farmed and in active production, with a creek through the property and frontage on County Road 1
Services
Not yet connected; sewer capacity is coming with the $88M wastewater plant expansion, expected in service in 2028
MLS®
29559134

Next steps: secondary planning, then rezoning and servicing allocation.

A closer look

From the air and from County Road 1

Aerial view looking northeast over both parcels: 18.3 acres on Highway 401 and 88.5 acres between County Road 1 and the CN rail line, with the creek crossing it18.3 ACRES88.5 ACRESHIGHWAY 401COUNTY ROAD 1JIM KIMMETT BLVDCN RAILcreek
Both parcels from the air, looking northeast · Boundaries approximate · Imagery © Google
Round hay bales across the 88.5-acre field, seen from County Road 1 under a summer sky
88.5 acres · County Road 1 · Aug 2026
The 88.5-acre field from County Road 1, harvested with bales in rows and a tree line on the horizon
88.5 acres · County Road 1 · Aug 2026
Imagery © Google
Excerpt of Schedule A, Land Use, Urban Area, of the Greater Napanee Official Plan, with the 88.5-acre parcel outlined in the Strategic Growth Secondary Plan Area and the 18.3-acre parcel outlined in the General Commercial designation on Highway 40118.3 ACRES88.5 ACRES401 · HWY 41
Schedule A excerpt · Town of Greater Napanee · Outlines added, approximate
On the Official Plan

Both parcels on the approved land use schedule

Schedule A of the new Official Plan places the 88.5 acres in the Strategic Growth Secondary Plan Area, at the western edge of the urban area between County Road 1 and the CN line. The 18.3 acres is in the General Commercial designation along Highway 401.

The new Official Plan, explained  →
Strategic Growth Secondary Plan Area
General Commercial
Selby Creek Secondary Plan
The two parcels (outlines approximate)
The path to approval
Sept 2024
Environmental Assessment completed, recommending three new arterial roads
Mar 2026
County adopts its growth framework to 2051
July 28, 2026
Town Council adopts the new Official Plan
Aug 6, 2026
Province approves the County framework, now in effect
Oct 21, 2026
County approves the Town’s plan, unanimously
Next
Secondary planning sets land uses, densities and street patterns, with landowners taking part
Questions buyers ask

About the 88.5 acres

Anything else, ask Jason directly: 613-572-6131

What is the 88.5 acres designated under the Official Plan?

Schedule A of Greater Napanee’s new Official Plan places it in the Strategic Growth Secondary Plan Area, one of the areas the plan sets aside for the town’s future growth. Town Council adopted the plan on July 28, 2026, and Lennox & Addington County approved it unanimously on October 21, 2026.

How is the land zoned today?

Under By-law 02-22 it is zoned Future Development (D) north of the creek and Extractive Industrial (M4) south of it, with Environmental Protection (EP) along the creek. No aggregate licence is held on the property. Rezoning to implement the new plan follows secondary planning.

What about water and sewer?

Sewer capacity is on the way. Greater Napanee’s $88M wastewater plant expansion is under construction, expected in service in 2028, and estimated to add capacity for up to 4,000 homes and businesses. Servicing for the growth lands is planned through secondary planning.

What has to happen before it can be developed?

Secondary planning comes next. It sets land uses, densities, local streets and servicing, and landowners can take part as it is prepared. Rezoning and servicing allocation follow before development can proceed.

Where exactly is it?

On County Road 1 West at the western edge of Napanee’s urban area, between County Road 1 and the CN line, inside the existing urban boundary. The 401/Highway 41 interchange is about 2.5 km away by road, with Kingston about 46 km east and Belleville about 40 km west.

Can it be bought together with the 18.3 acres on Highway 401?

Yes. The two parcels are listed separately and can be bought separately or together. Contact Jason McDonald, Broker, at Century 21 Lanthorn Real Estate Ltd., Brokerage, at 613-572-6131.

Also for sale
Satellite view of the 18.3-acre commercial parcel on Highway 401 in Greater Napanee
Designated General Commercial · Highway 401

18.3 acres with prime Highway 401 exposure

$10,000,000

Designated General Commercial, on the outside of a long bend in Highway 401 with the Jim Kimmett Boulevard retail corridor next door.

See this parcel  →
Both parcels are available separately or together. See both on the main page →